Product family
Automotive Spools & Sleeves
Precision matched spools and sleeves for VVT oil-control valves and CDC active-suspension solenoid valves, made from alloy steel, stainless steel or alumina ceramics.
- Minimum order
- 50 pieces
- Lead time
- Typically 20–30 days, confirmed per order
Part engineering
Design and manufacturing details
Manufacturing routes include Swiss-type turning, nitriding where applicable, precision cylindrical grinding and matched lapping. Multi-land sealing profiles and radial oil ports are produced to the specified geometry and fit. In VVT systems, the matched parts regulate oil direction and flow to the valve-timing actuator. In CDC suspension valves, they control throttle opening to vary damping. Machining focuses on the contact surfaces, sealing fit and wear-related material requirements. Material, heat treatment, geometry and inspection requirements are confirmed from the customer drawing.
- Controlled mating geometry
- Material options for the specified operating conditions
- Drawing-based process and inspection planning
Specifications
Materials and specification
Figures on this page apply to this family only and are confirmed against your drawing.
| Materials | Alloy steel, stainless steel and alumina ceramics |
|---|---|
| Processes | Swiss-type turning, applicable nitriding, cylindrical grinding and matched lapping |
| Tolerances | Specified and reviewed per drawing |
| Applications | VVT oil control and CDC suspension valves |
| Manufacturing basis | Customer drawings |
| Minimum order quantity | 50 pieces |
| Lead time | Typically 20–30 days, confirmed per order |
Process routes
- Matched spool and sleeve pairs
- Multi-land sealing geometry and radial oil ports
- Swiss-type turning, cylindrical grinding and lapping
- Drawing-specific heat treatment and fit control
Application
Passenger-car VVT oil-control systems; CDC continuous damping suspension valves
Inquiry
What to send for a quote
Send your drawing for automotive spools & sleeves with material and quantity. We review it before confirming a process route and lead time.
- Technical drawing, or a link to it
- Material and any plating or surface requirement
- Quantity. Minimum order: 50 pieces
- Inspection reports you need, if any
Related




